Specifications include, but are not limited to: Respondents must demonstrate the ability to embrace JOC, including:• The true understanding of TEAM and “to act as a unit”• Increased communication and coordination at all project levels via the frequency and timing of formal and informal Project meetings / conference calls• Willing to physically collocate with other design and construction team members / firms to facilitate interactive workflows and collaboration• Support the design process and offer constructive input from the Contractor’s standpoint• Creation of partnership relationships with all parties involved in the JOC process• Detailed monthly reporting • Employment of DOE design and construction standards as applicable • Use the DOE reporting and decision making processes to accurately and transparently convey the status and result of Project issues and options• Early and continuous involvement of Audit resourcesAs part of this JOC Delivery Process and as a team, we will need to establish a comprehensive list of standards and metrics for evaluating process success. The following list details some of the desired outcomes to be evaluated:• Project exceptionally satisfying to end users• Benchmarked cost results (both objective and subjective measures)• Profitable participation by all team members• No change orders (other than scope changes)• No litigation• Meet schedule and budget• Exceed desired safety metrics