Specifications include, but are not limited to: Replace an old 100 A breaker box and associated electrical wiring at the Sand Island Ambient Air Monitoring Station. 1. Electrical supply meter box: • All work to be performed by licensed electricians according to all applicable Federal, State, and County requirements; • All necessary HECO paperwork to perform installation and connection; • All necessary Honolulu County paperwork to perform installation; • One 100 Amp 2-pole main breaker on the meter main; • One secondary breaker box, wired identically as the existing secondary box, containing 2 each 60 Amp 2-pole breakers. • Replace all necessary service conduit and cabling on the load side of the meter main with appropriate size and type of copper wire and connect to permanent shelter • Electrical wiring to be performed per current NEC • Any required electrical inspections • Opening the HECO service request for the customer.