Specifications include, but are not limited to: TASK 1: Data Review and Task Analysis Review all available surveys and reference plans. Conduct a site investigation with the OHA to verify the existing conditions. Photo-document key features, access points/conditions, property edges, existing uses, adjacent off-site uses/conditions, views, noise generators, established landscapes (native and invasive), and other discoveries.1.Review OHA’s Wahiawā Lands Conceptual Master Plan (Final Draft Jan. 7,2019, amended version forthcoming);2.Provide scope and estimates for a topographical survey and other related work (to be conducted in the next design phase);3.Review existing easements;4.Study site access points;5.Read flora/fauna report (list of plants to consider for landscaping);6.Review soil remediation recommendations, existing site infrastructure,cultural/archaeological data, Conceptual Master Plan, Soil Conservation Plan,TCP and other pertinent studies; and 7.Prepare a site analysis map to record pertinent site features and list relevant opportunities and constraints.B.TASK 2: Preparation Site Plan Alternatives Prepare preliminary functional/programmatic relationship bubble diagrams followed by scaled site layouts to explore operational development plan alternatives for the property.1.Hold in-house brainstorming meeting with the OHA to discuss planning,landscape architecture, civil engineering work. Also review and discuss existing conditions, proposed program, and relationships between activities, circulation,and operational requirements that support the Draft Master Plan.2.Prepare alternative functional diagrams to analyze relationships between programmatic elements.