1. Written description of activities to minimize water pollution and soil erosion into drainage systems, sewer systems, and State waters. Include proposed means, methods, techniques, and procedures to be used for environmental control. BMP shall include, but not limited to, the following: a. An identification of potential pollutants and their sources. b. A list of all materials and heavy equipment to be used during construction. c. Descriptions of the methods and devices used to minimize the discharge of pollutants into drainage systems, sewer system, and State waters. d. Details of the procedures used for the maintenance and subsequent removal of any erosion or siltation control devices. e. Methods of removing and disposing hazardous wastes encountered or generated during construction. f. Methods of removing and disposing concrete and asphalt pavement cutting slurry, concrete curing water, and hydro-demolition water. g. Spill Control and Prevention, and Emergency Spill Response Plan. h. Fugitive dust control, including dust from earth-disturbing, hauling, grinding, sweeping, or brooming off operations, or combination thereof. i. Methods of storing and handling of oils, paints, and other products used for the project. j. Material storage and handling areas, and other staging areas, including storage of reinforcing steel and building material. k. Concrete truck washouts. l. Concrete waste and asphalt concrete waste control. m. Fueling and maintenance of vehicles and other equipment. n. Tracking of sediment offsite from project entries and exits.