All work is located at the State Laboratories Facility, 2725 Waimano Home Road, Pearl City, HI 96782 Contractor shall provide labor and materials for the following: Room 3205 – Install one (1) 6-20 receptacle, connect to panel 2EMEC and install new breaker. Room 2509 – Install two (2) new 5-20 duplex, connect to panel 2WPN and install new breakers. Room 2140 – Install one (1) new 5-20 duplex, connect to panel 2EPI or 2EPG and install new breaker. Room 2139 – Install one (1) new 5-20 duplex, connect to panel 2EPI or 2EPG and install new breaker. Room 2141 – install three (3) new 5-20 duplex, connect to panel 2EPG and install new breakers. Room 1136 – replace existing burnt outlet with equivalent outlet, remove and replace conductor. Replace breaker with new breaker.