This project generally consists of: 1) the installation of improvements to the existing wastewater treatment plant (WWTP), replacement of back-up generator with integral fuel storage, and a new leach field or other discharge method for secondary WWTP tank; 2) demolition of existing trash enclosure and construction of a new, relocated trash enclosure; and 3) improvements to mitigate flood areas including retaining walls, surface gutter(s), French drains and dry wells, buried drain lines and associated improvements. The project requires all work to be sequenced, scheduled, and completed in such a manner as to minimize disruption to ongoing property operations, the quiet enjoyment of property tenants, existing WWTP plant operations, and coordinate effectively with other construction activities that may be ongoing simultaneously at the property, all in accordance with the plans and specifications.