1. 1 L.S. Mobilization and Demobilization. Not to Exceed 10% of the Sum of Bid Items 2 – 5. $___________ 2. 1 L.S. Demolition and site preparation work including, but not limited to, removal and appropriate disposal of existing sinks, urinals, toilets, partitions, light fixtures, and appurtenances, power washing, cleaning, as shown on the plans and in accordance with the specifications. $___________ 3. 1 L.S. Repair work (excluding electrical work) including, but not limited to, new sinks, urinals, toilets, partitions, new flooring, painting, replacement of fire damage members, and appurtenant work as shown on the plans and in accordance with the specifications. $___________ 4. 1 L.S. Electrical repair work including replacement of fire damaged equipment, wiring, conduits, light fixtures, receptacles, switches, and appurtenant work as shown on the plans and in accordance with the specifications including restoration of power and coordination with electric utility company as needed. $___________ 5. 1 L.S. Sewer lateral investigation and repair including, but not limited to, camera inspection (as needed), sawcutting asphalt pavement, excavation, expose and determine location of sewer line break/obstruction, clear obstruction, repair sewer line, backfill, 6” compacted base course, and 2” asphalt repair with State Mix V. $___________