1. The work shall include, but not be limited to preparing a PS&E package for the following: a. Provide a fiberoptic communication path between the Makakilo Interchange and Kunia Interchange using a combination of new conduits/fiber and existing conduits/fiber being installed by other projects along Farrington Highway. b. Install two (2) new CCTV traffic cameras and one (1) new DMS along the H-2 Freeway between the Waipio Interchange and Waiawa Interchange. c. Install one (1) new CCTV traffic camera at the Waiawa Interchange. 2. The consultant shall prepare all construction plans, specifications, and estimates (PS&E) and all required environmental documents and permits. 3. Additional design considerations include, but are not limited to: a. Field investigations. b. Obtaining and reviewing “as-built” plans and records on file with the Highways Division, Department of Transportation, and “as-built” plans with other agencies and utility companies. c. Coordination with utility companies and relocation and/or adjustment of their utilities should it become necessary.