The work to be completed includes, but is not limited, to the following: A. The Contractor shall develop an operations plan/procedure for the drain inspection and cleaning, utilizing the information in the contract documents. Refer to Section 10.5, Submittals/Reports for the required submittals and reports. The submittal shall include the Best Management Practices Plan (BMP) that will be implemented. The BMPs shall in general follow the State’s Storm Water Management Program Plan (SWMPP). The SWMPP is available online at stormwaterhawaii.com for viewing or download. Include sequence of actions with timeline for the storm drain inspection and cleaning. The Contractor shall explicitly specify a weekly or monthly schedule. B. The Contractor shall inspect all the drains listed in the Appendices and record its findings in a format approved by the State. Refer to Section 10.8, Storm Drain Inventory and Location for more inspection information. C. Storm drain structures shall be inspected and cleaned during the work hours described in Section 10.9. D. The Contractor shall remove and replace bolts on all inlets within. The Contractor shall have the necessary tools and equipment to safely remove and clean all storm water inlets. A State or designated inspector must verify all structure are secure prior to opening lanes to traffic. The Contractor is responsible to replace all lost, stripped, rusted bolts. Replacement of bolts and hardware are reimbursable under the Miscellaneous bid item...