• No asbestos containing material or equipment shall be used. Contractor shall ensure that all materials and equipment incorporated in the project are asbestos-free. • Incinerator shall be suitable for outdoor installation including corrosion and moisture protection and shall be equipped for manual charging and operation. • The incinerator shall operate under negative pressure and shall be a complete package type unit, factory fabricated and assembled, with a free-standing exhaust stack, with unit mounted on appropriate frame for the project site. • The unit shall be ready for immediate mounting on a foundation and for attachment for fuel, electrical and stack connections. • Ash removal shall be an entire clean-out. • Unit loading should be through door that does not require additional machinery to open safely.