Specifications include, but are not limited to: The project includes the installation of fiber optic splice cabinets, associated power, fiber optic cables and communication infrastructure for ITS devices along the H-2 Freeway and modifications to existing splice cabinets in various locations. This project also includes the installation of safety rail systems and self-closing gates at existing variable message signs (VMS) at various locations.; WAIPIO CABINET, TRENCH EXCAVATION, QTY 100 L.F.; WAIPIO CABINET, CONCRETE, QTY 5 C.Y.; WAIPIO CABINET, 2"C PVC SCHEDULE 40, QTY 300 L.F.; WAIPIO CABINET, #10 XHHW CABLE, QTY 540 L.F. $; WAIPIO CABINET, STEP DOWN TRANSFORMER PEDESTAL, QTY 1 Each; WAIPIO CABINET, TYPE "A" TS PULLBOX, QTY 2 Each; WAIPIO CABINET, CCTV CABINET, QTY 1 Each; H2 CABINET, TRENCH EXCAVATION, QTY 250 L.F.; H2 CABINET, CONCRETE, QTY 15 C.Y.; H2 CABINET, 2"C PVC SCHEDULE, QTY 40 400 L.F.; H2 CABINET, 3"C PVC SCHEDULE, QTY 40 270 L.F.; H2 CABINET, #2 XHHW CABLE, QTY 60 L.F.; H2 CABINET, #10 XHHW CABLE, QTY 40 L.F.; H2 CABINET, TYPE "C" TS PULLBOX, QTY 2 Each; H2 CABINET, PULLBOX PENETRATION, QTY 2 Each; H2 CABINET, HECO TRANSFORMER PAD, QTY 1 Each; INSTALL GFE ETHERNET SWITCH, QTY 5 EACH; FIBER OPTIC PIGTAIL, QTY 42 EACH; FIBER OPTIC SPLICE, QTY 114 EACH; FIBER OPTIC JUMPER, QTY 24 EACH