The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed Water, Sewer & Natural Gas Main Extensions to serve the CCBCU Distribution Center as shown on the construction drawings. In general, construction consists of installation of approximately ±2,750 linear feet of 12-inch PVC water main, with fire hydrants, valves, fittings; ±1,000 linear feet of 2-inch HDPE natural gas main, ±3,000 linear feet of 4-inch natural gas main with valves and fittings, ±2,200 linear feet of 8-inch sanitary sewer of various cut depths with manholes, ±800 linear feet of 4-inch HDPE force main, submersible sewer pumping station, directional bores, jack and bore under S.R. 7, erosion control, NPDES monitoring, traffic control, and all other incidental items required for a complete project for the Owner.