The work to be completed shall consist of furnishing all materials and equipment and to perform all labor necessary to complete the Walter Way, Pine View and Memorial Park lift station rehabilitation improvements shown on the Drawings and as specified herein, including, but not limited to, mobilization/demobilization, bonds, insurance, demolition, temporary bypass connection, temporary bypass pumping, wet well rehabilitation, generator, valve vault, piping, valves, fencing, site work, wet well top, manholes, pumps, soil erosion and sediment control and grassing at the lift station site, construction exit, electrical, mechanical, painting and other appurtenances necessary to provide a complete and working installation.