Specifications include, but are not limited to: A. Construction of a concrete wet well. 1. The wet well is to be set on a cast in place concrete foundation and be topped by a cast in place concrete slab. 2. Access doors shall be installed in the top slab. 3. Installation of two submersible pumps, along with discharge bases, flanged discharge piping, guide rails, primary and backup level sensors, and all other accessories as required by the contract documents. 4. A third discharge base is to be installed for addition of a third pump in the future. B. Construction of a concrete valve vault. 1. The valve vault shall contain 6-inch discharge piping, check valves, plug valves, and pressure gauges. 2. Access hatches shall be installed in the top slab. 3. A floor drain is to be installed in the valve vault floor and to drain to the wet well. C. Construction of a concrete screening structure. 1. The screening structure shall contain a mechanical bar and conveyor system, a manually cleaned bar screen, manually operated slide gates, ladders, grating and handrails. 2. Installation of ultrasonic level sensors and a backup level sensor.