Specifications include, but are not limited to: The City is accepting bids from qualified contractors to provide all materials, labor, and equipment for the complete construction of the Windward Parkway Drainage Improvements. The scope or work includes but is not limited to, demolition and reconstruction of existing sidewalk, demolition of existing storm sewer system materials, installation of proposed storm sewer system materials (including but not limited to structures, pipe, and bedding), installation of curb and gutter, tree removal, grading, utility re-location, erosion control, traffic control, stabilization of disturbed soils, and related work. The location of work is along the Windward Parkway frontages of 1000, 1005, 2015 and 2025 Compass Pointe Drive, all within the City of Alpharetta.