Specifications include, but are not limited to: DOUGHERTY-MILE POST 0.0 – 5.9. LEE-MILE POST 6.35-6.61. General Provisions Traffic Control Special Provision Insect Control Control of Erosion and Sedimentation Miscellaneous Erosion Control Items Clearing of Right of Way Random Clearing Removal of Solid Waste Grassing 1.Vegetation Removal(random clearing and side trimming. Requirements under this ITB consists of furnishing all labor, material, tools, equipment, means of transportation and incidentals necessary to perform Vegetation Removal that includes random clearing or side trimming and herbicide applications within the limits of the right of way and easement areas of the interstate and limited access routes, 4 lane divided highways, 4 lane and 2 lane routes in a safe, effective, and timely manner, as detailed in herein. Services to be performed apply to interstate and state route transportation facilities within the existing and possible future rights of way as defined by GDOT. It is the intent of the Department that the successful Contractor will manage and perform all Vegetation Removal operations associated with roadways, bridges, drainage structures, roadside vegetation and aesthetics, traffic services, and as otherwise contained herein. The Contractor will also be responsible for any traffic control, licenses, and permits required satisfying the duties required herein