Specifications include, but are not limited to: 1 105 Mobilization 1 LS 2 163 Construct, Maintain and Remove Inlet Sediment Trap (Sd2-P: Pigs in a Blanket) 2 EA 3 163 Construct, Maintain and Remove Inlet Sediment Trap (Sd2-F: Filter Ring) 3 EA 4 171 Orange Construction Fence 105 LF 5 P-101-5.1 Transitional Milling 1,780 SY 6 P-151-4.1 Grubbing 1 AC 7 P-156-5.1 Temporary Seeding Complete 1 AC 8 210 Grading Complete 1 LS 9 411 Portland Concrete Sidewalk, 4" thick in Xmm, for Sidewalk, Concrete Strip, Dumpster Pad, and Staging Area 590 SY 10 438 Rollback Curb and Gutter, 24" 995 LF 11 P-209-5.1 Crushed Aggregate Base Course, including Bituminous Prime Coat, 8" Thick 2,875 SY 12 P-603-5.1 Bituminous Tack Coat 288 GAL 13 402 Recycled Asphaltic Concrete, 12.5mm, Superpave, 2" thick, GP 2 only, including Bituminous Materials and Hydrated Lime 1,680 TON 14 402 Recycled Asphaltic Concrete, 19mm, Superpave, 2," thick, GP 1 or 2, including Bituminous Materials and Hydrated Lime 320 TON 15 444 Sawcut, full depth 595 LF