Specifications include, but are not limited to: East Point Parks and Recreation Department is requesting official quotes for Paving for the Dog Park at Sumner Park Phase 1 Renovations Project. Please see below the scope of services for this project; Also see the attached plans/drawings for this project. A. The project involves concrete paving for the renovation of an existing park facility. Components for this portion include Only the Dog Park concrete paving. Fencing, stream crossing, trash receptacles, drinking fountain and waterline connections shown in the plans are NOT park of this quote. 1. Project Location: 1889 Lexington Avenue, East Point, GA 30344 2. Owner: City of East Point, Georgia B. The Work Consists of: 1. Silt fencing as shown in the Erosion Control Sheets for the entirety of the project. 2. Minor Demolition 3. Minor clearing and grubbing 4. Grading and Drainage 5. Concrete sidewalk paving C. The Work shall be constructed under a single prime Contract D. Cooperate with separate contractors so that work under those contracts may be carried out smoothly, without interfering with or delaying work under this Contract. E. Use of the Site: Do not disturb portions of the site beyond the areas indicated. Contractor shall not work on the site after 9:00 p.m. or before 6:00 a.m. without written consent from the Owner.