Specifications include, but are not limited to: This project involves the provision of all labor, equipment, materials, and expertise by the successful Proposer for preventive maintenance and repair services for a network of seven (7) permanent sewer flow meters and seven (7) portable rain gauges. ACCGov proposes to engage a proposer for the duration of five (5) years with an option to renew annually for two (2) successive years for a total period of seven (7) years beginning approximately July 2020. ACCGov currently has three wastewater treatment facilities within their sewer service area. The number of sewer meters to be placed and activated is 14 (14). The approximate location of these sewer meters is shown on the Meter Locations map found inAppendix A.The selected firm shall furnish and install a complete Sewer Flow Meter Installation and Data Collection System inclusive of all sewer meters, flow data loggers, server software, programming, web access, data compilation,and related ancillary items to serve the fourteen (14) sewer metering locations of the PUD. Only proposals for new sewer metering products will be accepted. Proposals that are based upon or utilize pre-owned or remanufactured equipment will not be accepted unless the equipment is currently in use by ACCGov.The PUD intendsto have two pricing scenarios put forth by the proposer. These two scenarios will be identical as technical specifications go, but approach ownership of the meters differently. The two scenarios are:1)Purchase and complete ownership of the sewer metering devices by ACCGov with contracted services with the proposer for the associated maintenance and data retrieval, as well as provision of the data in a ready-to-use format. PUD will have ownership of all data.2)Fully contracted services with the proposer for the provision of Proposer owned sewer metering devices and the associated maintenance and data retrieval, as well as provision of the data in a ready-to-use format. PUD will have ownershipof all data.