Specifications include, but are not limited to: 1. Sewer Cleaning, CCTV, and Interactive Mapping a. Provide labor and equipment for cleaning and video for the sewer system (Approximately 110,000 LF) b. Work shall be allowed to be performed between 7:00 am and 8:00 pm Monday to Saturday. c. Solids removed from the sewer system will be unloaded where Jekyll Island will take responsibility for the solids. d. An interactive video mapping system will be included that links a color-coded digital map with the actual video footage of the sewer pipes indicating the problem locations of the sewer system as analyzed by a Professional Engineer or equivalent professional. e. Ability to GPS and depth locate specific areas of sewer line via video footage +/- 1’ of horizontal distance or vertical distance