Specifications include, but are not limited to: The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the project titled Sanitary Sewer Rehabilitation Improvements – S. Lee Street, E. Ohoopee Street, and two (2) locations along West Central Avenue, as shown on the construction drawings. In general, construction consists of sanitary sewer main and service lateral rehabilitation and/or replacement in accordance with project schedules. Manhole rehabilitation work is also inclusive. Major items of construction include: 8” pipe-bursted main, 8” cured-in-place pipe, 4” service pipe replacement (open-cut, reconnections and/or pipe-burst/static pull on existing laterals and + 225 VF of manhole rehabilitation. Work also includes new sewer manholes and clean-outs in accordance with plan drawings and schedules and all other associated appurtenances necessary for a complete and operational project including asphalt and concrete pavement patches in. The goal of the work is to reduce system infiltration.