Specifications include, but are not limited to: Mobilization/demobilization; demolition of conflicting pipes, curbs and other obstructions; approximately 2,200 LF of RCP culverts ranging in size from 15” to 30” with associated drainage structures; a double 8’ x 6’ reinforced concrete box culvert with wing walls; sanitary sewer improvements consisting of approximately 175 LF of 15” and 1,700 LF of 8” PVC sewer lines with associated manholes and services; approximately 1,900 LF of 8” and 260 LF of 2” PVC water lines with associated valves, fittings and hydrants; approximately 8,600 SY street reconstruction and resurfacing with associated concrete curb & gutter; pavement striping; traffic control; necessary utility relocations; erosion control and grassing; complete surface restoration, and all other work and appurtenances required.