Specifications include, but are not limited to: 2, 3 Design and Construction Quality Records AR 1 Always auditable; Submit at project completion NA 3.3.5 Project Design Data Book (and updates) PDF 1 Within 21 days from NTP 1 7 2.1.1.1, 2.1.4, 3 Meeting minutes PDF 1 Within 3 days of each meeting 7 2.2.1 Management Plans (updates) PDF 1 As needed 14 2.2.2 Project Management Plan (PMP) PDF 1 See Section 2 21 2.3.2 Quality Management Plan (QMP) including Administrative portion and the DQMP PDF 1 Within 30 days from NTP 1 prior to the start of design 14 2.3.2 Construction Quality Management Plan PDF 1 See Section 2 14 2.4.1 Safety Plan PDF 1 See Section 2 14 2.4.6 Incident Management Plan 2 DB Team Non-Conformance Reports PDF 1 As needed NA 10.3.2 Demolition and Abandonment Plan PDF 1 Within 90 days from NTP 1 14 2.5.1 Baseline Project Schedule P6, PDF 1, 1 Within 60 days from NTP 1 30 2.5.3 Revised Baseline Project Schedule P6, PDF 1, 1 Within 14 days of being directed or as required 30 2.5.1, 2.5.3 Baseline and Revised Baseline Project Schedule resubmittals P6, PDF 1, 1 Within 14 days of being directed 14 2.5.2 Project Schedule Update P6, PDF 1, 1 5 th of each Month or as otherwise agreed 14