Specifications include, but are not limited to: The work to be completed shall consist of furnishing all labor, equipment and materials necessary to complete the electrical improvements shown herein including, but not limited to, installing seven (7) cellular based SCADA panels and accessories at seven (7) existing sewage pump stations and installing seven (7) RTU's in the water distribution system at the existing ground water pumping station, well sites, elevated storage tanks and valve station shown on the plans, reconnecting the SCADA panels, power and controls, modifying the existing chemical pump controller at the ground water pumpstation, modifying pump control panels, mounting antennas, replacing flow transmitters and sensors, replacing pressure transducers, adding circuit breakers in the existing pump control panels, extending cables and conduit as required, installing an 8" butterfly valve and actuator, installing concrete pads, extending the existing Unistrut support, demolition, and other appurtenances necessary to provide a complete installation