Specifications include, but are not limited to: This Scope of Work entails the removal of the existing roof and the installation of a new roof at the College Park Regional health Center in College Park, GA. Dumpsters (Allowance) 3` LS Construction Clean-Up 4 LS Demolition Standing Seam Metal Roof & Standing Seam Fascia 992 Sq. Ft. Demolition Fascia/Coping/Trim @Standing Seam Roof 574 Sq. Ft. Demolition Gutters 76 L.F. Demolition Downspouts 75 L.F. Demolition Plywood Roof & Fascia Sheathing 792 Sq. Ft. Demolition Metal Decking 676 Sq. Ft. Demolition Built-Up Roofing System 21,352 Sq. Ft. Demolition Pipe Vent Flashing 11 Each Demolition Metal Coping 628 L. F. Demolition Wall Membrane 10.58 Square Demolition Rigid Insulation 19,427 Sq. Ft. New Standing Seam Metal Roof 8.4 Square New Standing Seam Metal Fascia 1.52 Square New Standing Seam Coping, Flat Fascia Soffit, Flashing & Trim 574 Sq. Ft. New Plywood Roof and Fascia Sheathing @Standing Seam Roof 716 Sq. Ft. New Roof Underlayment @Standing Seam Roof 1581 Sq. Ft. New Ice and Water Shield 317 Sq. Ft. 3/4" Plywood Cap at Standing Seam Coping 164 Sq. Ft. New Metal Deck @Standing Seam Roof Canopies 676 Sq. Ft. Ridge Cap 38 L. F.