Specifications include, but are not limited to: A. Proceed with construction cleanup as constructionprogresses. 1. Remove mud, oil, grease, soil, gravel, trash, scrap, debris, and excess materials that are unsightly or may cause accidents to persons or properties. 2. Remove water from floor areas where electrical power tools are to be used, and prevent stains on concrete that will be exposed in finishwork. 3. Select and employ cleaning materials and equipment with care to avoid scratching, marring, defacing, staining, or discoloring surfaces cleaned. B. Final Cleanup: Perform immediately before written request for final inspection of Contract Work or any portion thereof. C. Besides normal "Broom Clean" requirements, clean exposed surfaces aslisted. 1. Glass: Wash and polish. 2. Painted Surfaces: Remove marks, stains, fingerprints, anddirt. 3. Exposed Slabs: Wash, scrape, and scrub, using detergent to remove bond breaker, dirt, and discolorations. 4. Asphalt Paving: Remove mud, oil, grease, dirt, and trash and hose down. 5. Aluminum: Clean following manufacturer’s recommendations. 6. Other Surfaces: Remove blemishes, leave clean, uniform, anddust-free. 7. Premises and Site: Remove trash, debris, and surplus excavatedmaterial. D. Leave premises orderly and "Broom Clean." SCHEDULE 3 - RESTORATION AND RESTABILIZATION A. Restore and re-stabilize disturbed areas including, but not limited to staging and stockpiling areas, construction strips, access roads, stream crossings, and areas within acquired right of way. B. Disassemble and remove all temporary construction facilities, and leave site in orderly and restored condition following Contract Documents. D. Preserve public and private signs, markers, guardrails, and fences, and maintain in existing locations and condition unless written permission is obtained for removal and restoration or replacement. 1. Remove conflicting facilities when grading operations begin and store in manner to keep them clean and in existing condition. 2. Restore to original or new locations at Owner’s direction. 3. Repair or replace damaged items when directed, at nocost to the Commission. E. Restore gravel surfaces and roadway shoulders to their condition before being disturbed. 1. Do not reuse shoulder material if contaminated by foreignmaterial. a. Replace with new material of same quality andgradation. 2. Materials and Methods of Construction: follow jurisdictional requirements and with applicable permits secured for this Contract. 3. Surface areas adjacent to shoulders, if left unstable by construction, with stabilized gravel or other acceptable stabilizing material.