Specifications include, but are not limited to: upgrade the controllers to new Galaxy or MCE controllers, upgrade door operators and hardware, modernize the elevator car cabs, and add the elevators to the GSU Liftnet network ; Replace existing controllers with equipment that meets ANSI standards Rewire existing door operators, motors, etc. as necessary Minor carpentry or masonry repairs, as necessary Upgrade elevator car cabs to GSU Standards ; Perform inspection of existing space and conditions Provide design that includes elevator wiring and programming Generate construction documents and specifications based on GSU’s review comments Provide construction estimates at each stage of design Generate a Guaranteed Maximum Price (GMP) based on the approved construction drawings, subject to approval by GSU At no additional cost, revise plans and/or GMP, if required, to meet the project budget Provide a project schedule Commence work upon receipt of Notice to Proceed (NTP) and execution of GMP change order Obtain all required permits.