Specifications include, but are not limited to: Review of existing plans and ongoing projects in the surrounding area. Prepare a detailed survey of existing physical conditions, including existing rights of way, and property, conflicting utilities, topography, structures and other potential constraints to proper horizontal and vertical alignments. A current and accurate ground run (two [2] foot contour interval) topographic survey is required and it must be provided in hard copy as well as a digital copy i.e. a CAD file. Survey shall include local issuing authority requirements for setbacks, zoning, buffers, surrounding land use and zonings. The Consultant should plan to provide the City with geotechnical exploration report findings, if necessary. The City will secure off-site easements and construction encroachment agreements for off-site construction, if necessary.