Specifications include, but are not limited to: Part A – Swainsboro 2018 LMIG The project will consist of concrete patching, bitum tack coat, overlay with 2,483 tons of recycled asphalt concrete 9.5 mm Superpave, traffic control, and appurtenances. Part B – Swainsboro 2019 LMIG The project will consist of concrete patching, bitum tack coat, overlay with 2,299 tons of recycled asphalt concrete 9.5 mm Superpave, traffic control, and appurtenances. Part C – Twin City 2018 LMIG The project will consist of installation of concrete patching, adjusting water valves, bitum tack coat, overlay with 373 tons of recycled asphalt concrete 9.5 mm Superpave, restriping, traffic control, and appurtenances. Part D – Twin City 2019 LMIG The project will consist of installation of concrete patching, bitum tack coat, 123 tons of recycled asphalt leveling, overlay with 310 tons of recycled asphalt concrete 9.5 mm Superpave, restriping, traffic control, and appurtenances.