Specifications include, but are not limited to: The successful respondent shall provide pothole repair services on an as-needed basis as assigned by the Fulton County Project Manager. Repairs will be assigned in groups of six (6) or more. Respondent must provide services within two (2) weeks after being notified that pothole patching services are needed. Respondent must provide all labor, tools, materials and equipment necessary to patch potholes of various sizes. Respondent must remove existing asphalt, road base material, and any sub-base/sub-grade material necessary to accommodate the repairs. The maximum depth of base removal is eight (8) inches, or a depth determined by the Project Manager. Pothole areas must be shaped evenly with sloping sides to the depth of the patch. The bottom and sides must be sprayed with the tack coat material