Specifications include, but are not limited to: Underground Utilitiestc \l2 "UNDERGROUND UTILITIES The Contractor shall verify all underground utilities and their locations prior to commencing any work under this contract. Damages to underground utilities, and costs to repair same, shall be the responsibility of the Contractor. Traffic Control tc \l2 "TRAFFIC CONTROLIt shall be the responsibility of the Contractor to maintain traffic by utilizing adequate construction signs and flagmen at all times. The Contractor shall furnish, install, maintain and eventually remove all traffic control devises necessary to properly protect and divert traffic. Such barricades and detour signs shall be illuminated at night. All costs associated with traffic control shall be the responsibility of the Contractor. The Contractor shall assume all responsibility for damages resulting from the failure of the signs and/or barricades to properly protect the work from traffic. Erosion Controltc \l2 "EROSION CONTROL The Contractor shall control all erosion by incorporating temporary grassing, mulch, baled straw, or silt fencing wherever required.