Specifications include, but are not limited to: Construction of: a. Auditorium b. Administrative offices c. Classrooms d. Landscape development (1) Walkways (2) Ramps (3) Utilities (4) Other site work. e. Toilets 2. Type Work: a. Concrete work: (1) Foundations (2) Retaining walls b. Interior walls and partitions: (1) Wood stud system c. Wood frame. d. Roof accessories e. Doors f. Hardware g. Glazing h. Interior finishes, furnishings (1) Gypsum drywall (2) Wood paneling (3) Woodwork (4) Cabinets ; (1) Drywall, ceilings and floor finish remain in the contract. (2) Plumbing work remains in the contract. (3) New Doors, frames and Hardware remain in the contract. (4) Replacement of window glass remains in the contract. (5) Toilet stalls and accessories remain in the contract. (6) HVAC work, including new ventilation, is to be under separate HVAC contract. (7) Painting is to be performed by the Georgia Department of Corrections. d. Framing for new sound booth depicted on enlarged plan 4-A6 and referenced sections performed under a separate contract prior to this contract.