Specifications include, but are not limited to: The piping of a 460’ long ditch along North Harrington Road. Work shall include, but not be limited to traffic control, clearing and grubbing to include necessary tree removal, dewatering the ditch, installation of new pipe and storm inlets, covering the pipe with fill material, the establishment of new shoulder and drainage profiles, grassing and stabilization.Option: The work to be performed under the optional portion of this contract consist of providing all skill, labor, material and equipment for replacing an 8” PVC pipe with a 30” HP storm pipe that crosses underneath North Harrington Road just east of Raymond’s Grant Trace. Work shall include, but not be limited to all necessary road cutting and replacement, traffic control, and the removal and replacement of the existing 8” PVC including backfill 30# flowable fill underneath the asphalt. Any clearing and grubbing to include any necessary tree removal.