Specifications include, but are not limited to: The work to be done consists of furnishing all labor, tools, equipment and materials necessary to construct the MAPLE AVENUE SIDEWALK IMPROVEMENTS – EAST 12TH ST. TO EAST 8TH ST. Contract “A” shall consist of the removal and replacement of existing concrete curb and gutter, concrete sidewalks and drives (including drive aprons) along the east side of Maple Ave, from the intersection of East 12th Street, SW, and Maple Street, SW, northerly to the intersection of East 10th Street, SW and Maple Ave, and the removal of one (1) 30” elm tree with stump and one (1) 24” hackberry tree with stump. All concrete curb and gutter and drive aprons installed shall match the existing curb elevations. This contract shall also include drainage improvements in addition to the items listed above. The approximate footage for this contract is 434 linear feet. Contract “B” shall consist of the removal and replacement of existing concrete curb and gutter, concrete sidewalks and drives (including drive aprons) along the east side of Maple Ave. from the intersection of East 10th Street, SW, and Maple Street, SW, northerly to the intersection of East 8th Street, SW and Maple Ave, as well as the removal of nine (9) tree stumps and one (1) 4” dogwood tree with stump. All concrete curb and gutter and drive aprons installed shall match the existing curb elevations. This contract shall also include drainage improvements in addition to the items listed above. The approximate footage for this contract is 1508 linear feet. Contract “C” shall consist of the installation of 23 Southern Maple Trees (acer Saccharum barbatum) along the east side of Maple Ave, from the intersection of East 12th Street, SW, and Maple Street, SW, northerly to the intersection of East 8th Street, SW and Maple Ave, as well as a guarantee of said trees for 1 year per caliper inch of the largest tree installed. Each tree to be selected and approved by Terry Paige, City of Rome Arborist, from the selected nursery.