Specifications include, but are not limited to: Removal of all existing Acoustical Ceiling Tile and installation of new 2’x2’ Acoustical Ceiling Tile. 2. Removal of all existing 2’x4’ fluorescent light fixtures and installation of new 2’x4’ LED light fixtures. 3. Removal and possible replacement of all whiteboards, tack boards and tack strips. 4. Cleaning, prepping and repainting all interior wall surfaces. 5. Repair and (or) replacement of select interior wood doors and metal door frames. 6. Rewiring and upgrading electrical and data wiring in select areas of the facility. 7. Replacing all battery toilet fixtures and toilet accessories (minus hand dryers) thorough out the facility. 8. Upgrading the all the multi-fixture toilets to become ADA compliant. 9. Upgrading all Locker Rooms in the Gym area.