Specifications include, but are not limited to: The Contractor shall furnish all labor, materials, equipment, and services required. a. Offices/Workspaces, and Conference Rooms (1) Empty all trash containers in designated receptacle (in the parking lot) and replace liners – daily. (2) Vacuum all carpeted floors and mop all tile floors – only once per week. b. Activity Rooms/Classrooms (1) Empty all trash containers in designated receptacle (in the parking lot) and replace liners – daily. (2) Sweep and mop floors with disinfectant and vacuum all carpeted floors – daily. c. Public Entrances, Lobbies, Reception Areas, and Corridors/Hallways (1) Empty all trash containers in designated receptacle (in the parking lot) and replace liners – daily. (2) Vacuum all carpeted floors and sweep and mop all tile floors – daily. (3) Clean and sanitize all water fountains – daily. (4) Clean glass and door handles at all main entrances – daily. d. Kitchens, Breakrooms and Dining Areas (1) Empty all trash containers in designated receptacle (in the parking lot) and replace liners – daily. (2) Clean and sanitize sinks, exterior of refrigerators, tables, and countertops – daily. (3) Sweep and mop floors with disinfectant and vacuum all carpeted floors – daily. e. Restrooms (1) Empty all trash containers in designated receptacle (in the parking lot) and replace liners – daily. (2) Thoroughly clean and sanitize – daily. (3) Restock paper supplies and soap in all restroom dispensers – daily. (4) Sweep and mop floors with disinfectant – daily.