Specifications include, but are not limited to: • Provide excavation from the RPZ to the side of the building in the grass area with an excavator • Provide 2” Pex line from the RPZ to the building with 4” bed of sand under the pipe and 6” of sand on the top of the pipe • Provide all pipe supports out of stainless-steel u-strut and cushion clamps • Provide a PRV station with two PRV, gauges, isolation valves and bypass around the PRVs • Provide coring as needed • Provide 3” K cooper to install a new potable and utility water headers parallel on the lower level • Provide 1” K cooper teeing off the new potable and utility water headers parallel header to the (4) motors • Provide ½” K cooper teeing off the 1” K copper to the mercoid switches and connected to the motors • Provide pro press copper fittings in 3”, 2”, 1” and ½” 90deg. Ell, 45deg. Ells, couplings, MPT adapters, and FPT adapters that screw into the isolation valves, unions, PRVs, gauge fittings, and strainers • Provide screw connection on all isolation valves, unions, PRVs, gauge fittings, and strainers • Provide labor to pick up materials • Provide labor to perform the proposed work • Provide project management