Site / Landscape: 1. Pave/repave driveway aprons, driveways, parking pads, walkways, and/or steps . 2. Complete any grading for and construction of the houses in accordance with all applicable codes. Roof: 1. Install code-compliant roof decking, with 30-lb felt weather barrier above roof sheathing. Roof: 1. Install code-compliant roof decking, with 30-lb felt weather barrier above roof sheathing 3. Provide required stormwater and erosion control measures per all applicable codes. 4. Position the structures per plans in Attachment B. Staking of building footprint must be inspected/approved by Construction Services Manager prior to pouring footings or slab. 5. Ensure that all final grade conforms to local building and zoning/development codes. 6. Install trees, plants and other landscape materials per plans in Attachment B. 7. Install community mailbox. 8. Install house numbers on exterior of homes. Foundation: 1. Pour footings and slab