Specifications include, but are not limited to: The scope of work includes the provision by the Contractor of all labor, materials, equipment, tools, transportation, and supplies necessary to complete the work. The Project will be “turn key” and require minimal involvement of Authority personnel. The work to be performed shall include the demolition and removal of 1,045 linear feet (LF) of 18” Corrugated Metal Pipe (CMP). The Project also includes installation of 1,045 LF of 18” reinforced concrete pipe (RCP), lining 119 LF of 36” CMP with a cured in place pipe (CIPP) liner, and installation of nine headwalls along with associated asphalt and curb and gutter restoration. Grading and erosion control devices required for the installation of these items is also included. The work will be installed in Douglas County in the Grove Park Subdivision by open cut methods as required and shown on the plans and specifications for the Grove Park Subdivision Storm Pipe Replacement Project, prepared by the Douglasville-Douglas County Water and Sewer Authority, Dane Hanson, P.E., dated May 8, 2019.