Specifications include, but are not limited to: Task #1 –Preliminary Engineering ReportComplete and provide apreliminary engineering report torecommendany viable, cost-effective means to provide sewer service to the requested area. Preliminary engineering report should provide preliminary pipe sizing and cost estimatesfor constructionof the project. Engineer shall conduct a thorough existing utility plan review.Identify the possible “alternate” bid items from the Project and include qualifiedconstruction costs(based on regional pricing for actual projects)for each alternative evaluated.Please consider the following two options: gravity and grinder solutions.Show recommended division into separate Construction Package, if any.Task #2 –Field Surveying ServicesPerform or obtain the services of a Registered Professional Land Surveyor Consultant to perform field survey services.Establish horizontal and vertical control for the project area. Horizontal datum shall be based on the Georgia State Plan, East Zone, and NAD83. Vertical datum shall be based on NAVD88. Provide a minimum of three (3) NGS B-order (or higher) stations thatshall be connected for the horizontal network and minimum three (3) third-order (or higher) bench marks shall be connected for the vertical network in accordance with Rule 180-7-.04(2) of the Rules and Regulations of the State of Georgia -Department 180. The locations shall be coordinated with the JWSC. Survey control maps, ASCII point files and copies of survey field notes will be provided. Locate all property corners and road rights-of way. Provide name(s)and mailing addressesof property owner(s), parcel ID numbers, etc.,in thoseareas affected by the work. Rear property corners are only required if the proposed sewer installation or any necessary easements impact the rear property corners. Provide boundary survey of entire proposed project area. Provide spot elevations at a maximum grid interval of 100-foot. Locate all visible improvements such as building, fences, permanent signs, sidewalks, curb and gutter, edge of pavement, driveways, mailboxes, and other structures located on the property or within 10 feet outside the ROWline, if accessible. Locate existing water lines (if any) with pipe sizes, water meters, valves,vaults, fire hydrants, etc. Locate existing sewer lines (if any) and indicate pipe size. Locate sanitary sewer manholes and provide top and invert elevations. Locate Private and Public Utilities -miscellaneous underground and overhead utility lines and above ground utilities indicators including gas, power, telephone, cable TV, fiber optic, etc. Provide cross-sectional detail at locations where route crosses existing features. We are looking for a bid alternate to perform a SUE Level A for this activity. See the Proposal Summary Sheet for this detail.Locate existing storm structures (swales/ditches, curb inlets, drop inlets, catch basins, junction boxes, and headwalls) and pipes. Provide pipe size, invert elevation, grate elevations, etc. Provide cross-sectional detail at locations where route crosses existing features. Locate trees within the right-of-way. Identify discrepancies or conflicts in boundaries, any visible encroachments, and any portion of the property within the 100-year floodplain by graphical plotting only, as shown on the current Federal Emergency Management Agency map.Delivery of Field Survey –original survey field books and electronic files, survey control map, and survey drawings to the JWSC.Task #3 –Easement Preparation ServicesPerform or obtainthe services of a Registered Professional Land Surveyor Consultant to perform easement preparation services.Prepare easement sketches and legal descriptions as necessary to facilitate installation of new water and sewer services. System design should remain in ROW whenever practical.