Specifications include, but are not limited to: Engineering design, permitting and construction management services proposals from qualified engineering firms for system improvements related to 2016 SPLOST North Mainland Phase II and III to include force main and pump station improvements. This will include the following: • Development of bidding documents for CIPP lining of existing force main section to be determined by CCTV inspection to include the following considerations: o structural condition suitable for CIPP lining vs. full replacement o I/I reduction o sealing of any lateral penetrations (top hat/grout) • The installation of approximately 18,000 linear feet of 18” wastewater force main from PS4110 Harry Driggers to Old Jesup/Canal Road to 20” Ogden to PS4036 (terminated to manhole #SSMH 40360010) See Exhibit A for details on routing. o Facilitate connection to the pump stations along the route. o All piping, fittings, casing, appurtenances and other materials as required. o All road paving/replacement as required.