Specifications include, but are not limited to: DESIGN PHASE 1. Gravity Sewer and Pump Station Modification Design • Survey and elevation analysis. • Preparation of drawings necessary for construction to include a plan and profile that indicates pipe route, size, and valve & appurtenance locations in relation to adjacent existing property lines, right-of-ways, structures and utilities in compliance with all applicable state, local and JWSC Standards. • Details of any road/wetland/stream crossings. • Details of any conflicts with other utilities. • Details of any system connections. • Construction details. • Erosion Control plans & specifications required for construction. • Quantity takeoff and Opinion of Probable Cost • Technical Specifications • Design calculations as necessary to verify pipe and pump sizing, elevations, electrical upgrades, wet well requirements & specifications. • Thorough wet well condition assessment. • Evaluation and recommendation regarding measures to improve odor control. • Secure and coordinate with Geotechnical Consultant if necessary. 2. Erosion Sedimentation & Pollution Control • Preparation of drawings and specifications required for construction. 3. Project Meetings • Attendance at key project milestone meetings will be required to include public information meetings, JWSC Commission and 2016 SPLOST Oversight Committee meetings.