Specifications include, but are not limited to: 1)Scheduling Preliminary/Interim/Final Field Plan Review meetings:a.Coordination and scheduling inspection meeting date(s). b.Inspection meeting facility (plan review session).c.Inspection meeting scheduling letter. 2)Reviewing construction project plans and contract documents for conformity to:a.Project Concept Reports or Location Design Approval document.b.Applicable Federal Highway Administration (FHWA) Policies.c.Applicable American Association of State Highway and Transportation Officials ( AASHTO) Design Policies.d.Applicable Georgia Department of Transportation (GDOT) Design Policies.e.Applicable GDOT Plan Presentation Guide (PPG) and Electronic Data Guidelines (EDG).f.Applicable Value Engineering (VE) Study Alternates approved for implementation. 3)Reviewing construction project plans and contract documents for errors, omissions, and conflicting information 4)Reviewing construction project plans to ensure all appropriate items and quantities are included in the Summary of Quantities and match the Cost Estimating System (CES) Detailed Estimate. 5)Reviewing construction project plans and contract documents for compliance to:a.Applicable National Environmental Policy Act/Georgia Environmental Policy Act (NEPA/GEPA) commitments.b.Applicable National Pollutant Discharge Elimination System Permitting Program (NPDES) and 404 permit requirements.c.Applicable American Disability Act (ADA) requirements.