Specifications include, but are not limited to: 13 Air Handling Unit replacements for buildings A (2 AHU’s), B (3 AHU’s), C(1), D(1), E(1), F(1), G(1), H(1), J(1), and K(1). Buildings D through K are dormitory buildings, multi zoned and are typical of each other. The project also includes replacement of two heating boilers (3,818,000 Output BTU each), and two domestic water heaters (1,738,000 BTU Output each) and holding tanks located in the main mechanical room. The project will include but not limited to all equipment, controls, necessary duct and piping modifications, vav’s, reheat coils, associated pumps and all required electrical work. Some units for A, B, and C buildings have vav boxes that are also within scope of project. ACM testing and abatement will be part of project documents