Responsibilities of the Design-Build Team • Site assessment and demolition planning • Architectural and engineering design • Permitting and code compliance • Construction and project management • Final inspection and close-out documentation Mechanical • Removal of one existing Water Source Heat Pump • Existing ductwork to be re-used to the extent possible • New supply and return ductwork, registers, grilles, and diffusers • Address the impact of partial renovation Electrical • New circuits for WSHPs, lighting, switches, and receptacles • New 2x4 LED flat panel lighting Fire Protection: • Moving and adding sprinkler heads to accommodate the new floor plan Turnkey construction including: • New walls & doors • Carpet tile flooring • Walk-up window • Acoustical ceiling