Specifications include, but are not limited to: The scope of this contract is for the demolition and proper removal of the structures and other site improvements including: 1.Structure 1 –Concrete block/frame commercial structure on concrete slab2.Structure 2 –Steel frame canopy3.Structure 3 –Trash enclosure4.Structure 4 -Frame/sheet metal storage structure and 18”diameter steel supports(2)for removed business sign/associated sign footing5.Asphalt paving, approximately 6500 sq ft6.Concrete paving, approximately 4354 sq ft7.Curb and gutter,approximately 360lnft8.6’ high wood privacy fence, approximately 60 ln ft and8bollards, 9.Sign footing and partial posts from relocated “TitleMax” sign10.Miscellaneous structures concrete bases for vacuum/air stations,2 –3’6” x 3’6” sq, (2) sign bases, approximately 2’ x 2’ sq or 2’ dia x unknown depth, steel gate posts and associated footings11.Underground storage tanks and associated components –dispensers, piping, islands, vents, monitoring wells, etc. See separate scope of work included in this document. The demolition contractor will use a GDOT Right of Way pre-qualified UST consultant to monitor, perform collection of required samples,and prepare closure report and other required documentation.All improvements must be completely demolished and removed from their present site. All demolition debris must be removed and disposed of properly in an appropriatelandfill or recycled in accordance with the provisions of the Georgia ComprehensiveSolid Waste Management Act of 1990 and the Georgia Rules for Solid WasteManagement Chapter 391-3-4. The work will be completed in strict accordance withthe Technical Specifications.