A. Material Specifications – Bleacher / Press Box Per field (2 total) Spirit Bleacher on field 2 (1 total) Bleachers – See attached specifications Section 13 34 30 Permanent Bleacher with Press Box & Section 13125 Frame Type Bleacher Silver Edition Elevation Series, Model 521E. Hardware – All necessary hardware to complete the press box and bleachers. Concrete Pad – Concrete pad will be poured by owner prior to bleacher installation. Contractor shall inspect the pads on site to ensure that they meet all the necessary requirements before installation of said bleachers. Electrical – Bleacher provider shall coordinate with on-site contractor for final electrical service connection to press boxes. Coordination – Bleacher contractor shall coordinate with site contractor to schedule delivery, stagging, and installation.