Specifications include, but are not limited to: The work for the Dacula Area Water Main Improvements – Phase II project consists of replacing existing water lines with approximately 9,600 linear feet of 8-inch diameter ductile iron pipe in three (3) residential areas in the City of Dacula. The project also includes the abandonment of an in-line booster pump station along Harbins Road, approximately 7,500 square yards of asphalt milling and repaving, water main disinfection, connection of all existing water services to the new water mains, relocation of approximately 27 water meters, installing new water main valves and fire hydrants, salvaging existing fire hydrants, curb and gutter restoration, driveway cut restoration, exploratory excavations, disturbed area restoration, erosion and sediment control, traffic control, preparation of record drawings, and all related appurtenances as shown on the drawings or specified.