Specifications include, but are not limited to: A. Project Management – Includes project staffing, project administration, management, of overall project organization and refinements in program administrative planning, QA/QC process, progress reporting, correspondence and monthly invoicing. Consultant shall include monthly progress reports with each invoice to update the City on work performed, effort planned for the following month, and all issues that may affect scheduled delivery dates and costs. B. Design Development Report Review – Review the Design Development Report (Attachment B), which will be used as the basis of design and provide a letter concurring to the results and recommendation presented or identify any deviations to the proposed recommendations. C. Review of the Solids Flux Testing Summary Report (Attachment E) 1. The consultant shall review the Solids Flux Testing Summary Report, which was performed by Evoqua Water Technologies in July 2017, and consider the feasibility and applicability to the Canton Wastewater Treatment Plant. D. Pre-Selected Equipment 1. The following equipment will be used to match the existing equipment. a. Grit Removal equipment will be provided by Smith & Loveless. b. SBR equipment will be provided by Xylem (Sanitaire). c. Aeration Blowers will be provided by Aerzen. d. Should filters be used in the new tertiary treatment process, the filters will be provided by Parkson.