Specifications include, but are not limited to: construction of gravity sewers and force mains of four (4) inch through eighteen (18) inch diameter including manholes, service lines, service connections, road crossings, site work, appurtenances, erosion/sediment control measures, labor and materials necessary to install the authorized work. The Project also includes the construction of water lines of two (2) inch through eighteen (18) inch diameter including valves, fire hydrants, services connections, road crossings, site work, appurtenances, erosion/sediment control measures, labor and materials necessary to install the authorized work. The Contract No. 2 Project consists of the construction of storm sewers of twelve (12) inch through thirty (30) inch diameter. Also included is the construction of junction boxes, curb inlets, grate inlets, road crossings, site work, appurtenances, erosion/sediment control measures, labor and materials necessary to install the authorized work.